published on January 28, 2019 - 1:04 PM
Written by ,

(AP) – Toshiba Corp. unveiled a remote-controlled robot with tongs on Monday that it hopes will be able to probe the inside of one of the three damaged reactors at Japan’s tsunami-hit Fukushima nuclear plant and grip chunks of highly radioactive melted fuel.

The device is designed to slide down an extendable 11-meter (36-foot) long pipe and touch melted fuel inside the Unit 2 reactor’s primary containment vessel. The reactor was built by Toshiba and GE.

An earlier probe carrying a camera captured images of pieces of melted fuel in the reactor last year, and robotic probes in the two other reactors have detected traces of damaged fuel, but the exact location, contents and other details remain largely unknown.

Toshiba’s energy systems unit said experiments with the new probe planned in February are key to determining the proper equipment and technologies needed to remove the fuel debris, the most challenging part of the decommissioning process expected to take decades.

The three reactors at the Fukushima plant suffered core meltdowns after a massive 2011 earthquake and tsunami damaged key cooling systems.

In last year’s probe, a camera developed by Toshiba Energy Systems & Solutions Corp. and the International Research Institute for Nuclear Decommissioning found large amounts of deposits in that area, including parts that resembled pebbles or gravel.

The 30-centimeter (12-inch) long robot unveiled Monday will carry a radiation dosimeter, thermometer, LED lights, a camera and a pair of tongs as it slowly slides down from a pipe. The probe, attached by a cable on its back, is to dangle from the pipe and descend to the bottom of the reactor vessel’s pedestal, a structure directly below the core from which the melted fuel fell.

Toshiba plans to use the new device to touch and grip the deposits with the tongs, which can hold a lump as wide as 8 centimeters (3 inches) weighing up to two kilograms (4.4 pounds), to investigate its hardness and other details, said Jun Suzuki, a Toshiba ESS group manager for the project.

“Until now we have only seen those deposits, and we need to know whether they will break off and can be picked up and taken out,” Suzuki said.

“Touching the deposits is important so we can make plans to sample the deposits, which is a next key step.”

The probe will mainly examine the fuel debris’ physical condition rather than its radioactive components or other details which require actual sampling and safe storage.

“We are taking one step at a time,” said Tsutomu Takeuchi, a Toshiba ESS senior manager for the Fukushima decommissioning project. “First we’ll find out if those deposits can be picked up.” If the device is unable to lift anything, that’s also a key finding, he said. In that case, they will need a cutting device to tear off a sample piece.

TEPCO and government officials plan to determine methods for removing the melted fuel from each of the three damaged reactors later this year so they can begin the process in 2021.


e-Newsletter Signup

Our weekly poll

Should California ban all forms of advertising for legal cannabis?

Loading ... Loading ...

Central Valley Biz Blogs

Popup
shares

3/5

Article views

remaining

Sign up icon

To continue website access to

TheBusinessJournal.com

please create a FREE account OR login here.

1/5

Article views

remaining

SKIP THE POP-UPS
For only $59 for one 1-year you will receive the Print edition along with EVERYTHING The Business Journal has to offer digitally, PLUS you will have unlimited 24- hour a day access to view articles at

TheBusinessJournal.com

Use Promo Code

*New Subscribers Only

Digital and Print

XX Days Remaining

until you can view 5 more free articles

Sign up icon

Want access? Subscribe now & save $20 OFF.

Use Promo Code

WEBSUB20

* NEW SUBSCRIBERS ONLY